Metro Atlanta

Additional Perimeter closures set for I-285, Ga. 400

Map depicts the recommended detour when southbound Peachtree Dunwoody Road is closed at I-285 in the Sandy Springs and Dunwoody area. GEORGIA DEPARTMENT OF TRANSPORTATION
Map depicts the recommended detour when southbound Peachtree Dunwoody Road is closed at I-285 in the Sandy Springs and Dunwoody area. GEORGIA DEPARTMENT OF TRANSPORTATION
By David Ibata
Jan 29, 2020

The Georgia Department of Transportation has announced additional overnight lane, ramp and street closures for the ongoing reconstruction of the I-285/Ga. 400 interchange in the Sandy Springs, Dunwoody and Brookhaven areas of the Perimeter.

All closures are “weather permitting” and scheduled for 9 p.m. to 5 a.m.

Through Thursday: the ramps from eastbound I-285 to Glenridge Drive, and from northbound Ga. 400 to westbound I-285, and the two right lanes of westbound I-285 from Peachthree Dunwoody Road to Glenridge.

Through Friday: the ramp from southbound Ga 400 to eastbound I-285.

Through Saturday: Lake Forrest Drive from Allen Road to Northwood Drive.

Through Sunday: the ramp from westbound I-285 to northbound Ga. 400.

Wednesday-Friday: the ramp from Asford Dunwoody Road to westbound I-285, and two right lanes of eastbound I-285 from Glenridge to Ga. 400.

Thursday-Saturday: southbound Peachtree Dunwoody Road from Hammond Drive to Lake Hearn Drive; and the ramps from southbound Ga. 400 to westbound I-285, and from northbound Ga. 400 to eastbound I-285.

Information: https://bit.ly/2t1hLaG

About the Author

David Ibata

More Stories