Here is the latest information on lane closings, and possible traffic delays, this weekend in metro Atlanta, per GDOT.

Click here to get more information about Atlanta's weather and weekend events

Downtown Connector

 Up to four northbound lanes will close from Abernathy Boulevard/Capitol Avenue and four southbound lanes will close from Abernathy Boulevard/Capitol Avenue to 10th, 14th and 17th Streets from 9 p.m. Friday to 5 a.m. Monday for striping.

• Traffic will shift on the southbound ramp to I-20 eastbound from 9 p.m. Friday to 5 a.m., Monday. The interchange will remain open during work.

I-285

  Northbound, one lane and part of the entrance and exit ramps from SR 260/Glenwood Road to Chamblee Tucker Road will close nightly from 9 p.m. Friday to 5 a.m. Monday for striping.

 Two northbound lanes will close from SR 279/Old National Highway to SR 6/Camp Creek Parkway and one northbound lane will close from SR 139/Martin Luther King Jr. Drive to the I-20 interchange from 9 p.m. Friday to 5 a.m. Monday.

Rolling lane closures will take place southbound from SR 279/Old National Highway to the I-20 interchange from 9 p.m. Friday to 5 a.m. Monday.

One northbound and one southbound lane will close at South Atlanta Road from  7 a.m. to 7 p.m. Saturday.

• One lane will close on the eastbound ramp to I-85 northbound from 9 p.m. Friday to 5 a.m. Monday.

• The Express Lanes project will require traffic to shift on the westbound collector-distributer lanes and one lane will close eastbound at the I-75 interchange from 9 p.m. Friday to 10 a.m. Saturday.

I-20

Three eastbound lanes will close on from Langhorn Street to McDaniel Street from 9 p.m. Friday to 5 a.m. Monday.

 Two westbound lanes from Alcovy Road to SR 12/US 278 and the ramp from Alcovy Road to I-20 will close continuously from 9 p.m. Friday until 5 a.m. Monday.

I-85

One northbound and one southbound lane will close from SR 139/Riverdale Road to Cleveland Avenue nightly from 9 p.m. Friday to 5 a.m. Monday for striping.

Bridge work on Spaghetti Junction will require one lane closure on the southbound ramp to I-285 eastbound from 9 p.m. Friday to 5 a.m. Monday.

One lane will also close on the northbound ramp to I-285 eastbound from 9 p.m. Friday to 5 a.m. Monday.

I-75

• Two lanes will close northbound from Mount Paran Road to Cumberland Boulevard from 9 p.m. Friday to 7 a.m. Saturday.

I-575

The Express Lanes project will require one northbound and one southbound lane to close from Barrett Parkway to Bells Ferry Road from 9 p.m. Friday to 10 a.m. Saturday.

 A traffic shift will occur northbound from SR 20/SR 81 to Jonesboro Road from 9 p.m. Friday to 9 a.m. Saturday for work on the South Metro Express Lanes.

State routes, highways and surface streets

• One eastbound and one westbound lane and shoulder will close on SR 316 from Herrington Road to SR 120 continuously from 9 p.m. Friday to 5 a.m. Monday for resurfacing.

• Two lanes will close on Ga. 400 southbound from Lenox Road to Sidney Marcus Boulevard from 8 a.m. to 5 p.m. Saturday and Sunday.

• On U.S. 78, one eastbound lane will close from the I-285 interchange to Memorial Drive and two westbound lanes will close from Memorial Drive to Brockett Road from 9 p.m. Friday to 5 a.m. Monday.

• Two lanes will close on SR 155/Candler Road from Valley Ridge Road to McAfee Road from 8 a.m. to 4 p.m. Saturday.

• On SR 154/Memorial Drive, one lane will close between Moreland Avenue and Wilkinson Drive and one lane will close on SR 154/Memorial Drive between East Lake Drive and Candler Road. Both closures are from 9 a.m. to 3 p.m. Saturday.

Click here to get realtime updates on traffic conditions around the metro area

Follow the @AJCWSBTraffic on Twitter to get those updates on the go