East Brandon Drive is closed to through traffic to Aug. 15 between Stockman Drive and Brandon Ridge Drive.

This project includes replacing an existing 18-inch corrugated metal pipe, paving the inverts of three 84-inch corrugated metal pipes, constructing new headwalls, replacing drainage structures and repaving the failure area.

Information: cobbdot.org.