Sidewalk construction has begun on North Druid Hills Road from Arrington Place heading south to Lenox Park Boulevard, according to Brookhaven officials.
The equipment used for the project will be placed in the extra space of the turn lane just before Lenox Park Boulevard so as not to inconvenience the other two lanes and should not interfere with the traffic turning right onto Lenox Park Boulevard at the signal or with normal traffic flow. The equipment will only be located in that turn lane between 9 a.m. to 3 p.m. weekdays.
Motorists may want to consider alternate routes.
Information: www.brookhavenga.gov.
About the Author
The Latest