Here is the latest information on road closures this weekend, across the metro Atlanta area, per GDOT.

Click here for more info about the weekend's weather forecast and events

I-285

• Striping will require one lane closure northbound from SR 10/Memorial Drive to Northlake Parkway from 9 p.m. Friday to 5 a.m. Monday.

• Two northbound lanes will close at Northlake Parkway from 7:30 p.m. Friday to 7 a.m. Saturday.

• Two southbound lanes will close from SR 280/South Cobb Drive to SR 139/Martin Luther King Jr. Drive and two northbound lanes will close from the I-20 interchange to South Atlanta Road continuously from  9 p.m. Friday to 5 a.m. Monday.

• Work on Spaghetti Junction will require one eastbound and one westbound lane to close inside of Spaghetti Junction over I-85 continuously from 9 p.m. Friday to 5 a.m. Monday.

• Work on Spaghetti Junction will also require one lane closure on the ramp from I-285 westbound to I-85 southbound continuously from 9 p.m. Friday to 5 a.m. Monday.

• Bridge work on Spaghetti Junction will require part of the exit ramp to SR 13/Buford Highway from I-285 westbound to close continuously from 9 p.m. Friday to 5 a.m. Monday.

• The Express Lanes project will require one lane closure on the eastbound collector-distributer lane to I-75 on Saturday from 6 a.m. to 3 p.m. Saturday.

I-85

• One northbound lane will close between Jimmy Carter Boulevard and Indian Trail Road from 10 p.m. Friday to 9 p.m. Saturday.

I-20

• One westbound and one eastbound lane will close from Almon Road to the Newton County line from 9 p.m. Friday until 5 a.m. Monday.

• Two westbound lanes will close from Langhorn Street to SR 139/Martin Luther King Jr. Drive/Anderson Avenue continuously from 9 p.m. Friday to 5 a.m. Monday for bridge joint replacement.

I-75

• Southbound at SR 120 Loop/Marietta Parkway two lanes and one on-ramp lane will close from 9 p.m. Friday to 7 a.m. Saturday.

I-575

• The Express Lanes project will also require one lane closure northbound from Barrett Parkway to Chastain Road from 9 p.m. Friday to 10 a.m. Sunday.

Highways, state roads and surface streets

• Paving on US 78 will require one lane closure and various ramp and shoulder closures from Montreal Road to SR 10/Memorial Drive from 9 p.m. Sunday to 5 a.m. Monday.

• On Ga. 400, one southbound lane will close from the Toll Plaza to the tunnel south of Lenox Road from 9 p.m. Friday to 5 p.m. Sunday for fiber optic cable installation;

• Two northbound and two southbound lanes will close on Ga. 400 at Northridge Road from 7 p.m. Saturday to 10 a.m. Sunday.

• Pipeline construction will require one lane closure at SR 237/Piedmont Road and Habersham Road on Saturday from 8 a.m. to 5 p.m.

• One lane will close on SR 10/Freedom Parkway at US 78/US 278/Ponce de Leon Avenue from 8 a.m. to 8 p.m. on Saturday and Sunday.

• On SR 154/Memorial Drive, one lane will close between Moreland Avenue and Wilkinson Drive and one lane will close on SR 154/Memorial Drive between East Lake Drive and Candler Road. Both closures are on Saturday from 9 a.m. to 3 p.m.