Here is the latest information on lane closings, and possible traffic delays, this weekend in Atlanta, per GDOT.

Click here to get realtime updates on traffic conditions around the metro area

Follow the @AJCWSBTraffic on Twitter to get those updates on the go

Downtown Connector

• One southbound lane will close at Abernathy Boulevard/Capitol Avenue from 6 a.m. to 3 p.m. Saturday and Sunday for sign structure work.

Traffic will shift on the southbound ramp to I-20 eastbound from 9 p.m. Friday to 5 a.m. Monday. The interchange will remain open during work.

I-285

• One lane and part of the entrance and exit ramps from SR 260/Glenwood Road to Lavista Road will close nightly from 9 p.m. Friday to 5 a.m. Monday for striping.

• Two northbound lanes will close from Cascade Road to South Atlanta Road and one southbound lane will also close at South Atlanta Road continuously from 9 p.m. Friday to 5 a.m. Monday.

• Two southbound lanes will close on from SR 139/Martin Luther King Jr. Drive to Cascade Road from 5 a.m. to 8 p.m. Saturday.

• One lane will close on the eastbound ramp to I-85 northbound from 9 p.m. Friday to 5 a.m. Monday.

• The Express Lanes project will require a traffic shift on the westbound collector-distributer lanes at the I-75 interchange from 9 p.m. Friday to 10 a.m. Saturday.

I-20

• Three westbound lanes will close from Windsor Street to SR 139/Martin Luther King Jr. Drive/Anderson Avenue from 1 a.m. Saturday to 5 a.m. Monday.

• Two westbound lanes will close from Alcovy Road to SR 12/US 278 from 9 p.m. Friday to 5 a.m. Monday.

I-85

• One northbound and one southbound lane will close from SR 74/Senoia Road to the I-285 interchange and from SR 139/Riverdale Road to Cleveland Avenue from 9 p.m. Friday to 5 a.m. Monday.

• Bridge work on Spaghetti Junction will require one lane closure on the southbound ramp to I-285 eastbound from 9 p.m. Friday to 5 a.m. Monday.

• One lane will also close on the northbound ramp to I-285 eastbound from 9 p.m. Friday to 5 a.m. Monday.

I-75

• The Express Lanes project will also require one lane closure northbound from Windy Hill Road to SR 280/Delk Road from 9 p.m. Friday to 10 a.m. Saturday.

I-575

• The Express Lanes project will require one lane closure northbound from SR 92/Alabama Road to Bells Ferry Road from 9 p.m. Friday to 10 a.m. Saturday.

• One lane will close northbound and southbound from SR 20/SR 81 to SR 155 from 7 a.m. until 2 p.m. on Saturday for work on the South Metro Express Lanes.

• Traffic will shift northbound from SR 155 to Jonesboro Road from 8 a.m. Saturday to 7 a.m. Monday for work on the South Metro Express Lanes.

State routes, highways and surface streets

• One lane will close on Northridge Road at Ga. 400 from 9 p.m. Friday to 5 a.m. Monday.

• Two lanes will close on Ga. 400 southbound from Lenox Road to Sidney Marcus Boulevard from 8 a.m. to 5 p.m. Saturday and Sunday.

• On U.S. 78, two eastbound and two westbound lanes will close from Montreal Road to Mountain Industrial Boulevard from 9 p.m. Friday to 5 a.m. Monday.

• One lane will close at SR 10/Freedom Parkway and Boulevard from 8 a.m. to 8 p.m. Saturday and Sunday.

• On SR 154/Memorial Drive, one lane will close between Moreland Avenue and Wilkinson Drive and one lane will close on SR 154/Memorial Drive between East Lake Drive and Candler Road. Both closures are from 9 a.m. to 3 p.m. Saturday.

Click here for a list of weekend activities in Atlanta