Metro Atlanta

Roswell posts online survey on Ga. 400 bridge aesthetics

Roswell residents have until Thursday, April 16, to complete an online survey on what they’d like to see for three bridges to be built over Ga. 400. CITY OF ROSWELL
Roswell residents have until Thursday, April 16, to complete an online survey on what they’d like to see for three bridges to be built over Ga. 400. CITY OF ROSWELL
By David Ibata
April 14, 2020

Roswell residents have until Thursday to participate in an online survey on proposed aesthetic enhancements for three bridges to be built over Ga. 400.

In a Facebook posting, the city says residents have “a once-in-a-lifetime opportunity to design bridge aesthetics that reflect the character and desires of Roswell.” The survey asks residents what special styling, materials and finishings they’d like to see, such as stamped brick surfaces, stylized metal fencing, decorating lighting and landscaping.

The three bridges are for Big Creek Parkway, to be completed in 2024; and the Holcomb Bridge Road interchange and Ga. 400 Express Lane bridge connecting Grimes Bridge and Old Alabama roads, both to open in 2027. The latest survey follows up a poll of residents taken last November. To view responses to the earlier survey: https://bit.ly/3cgel4Z

The present survey "provides additional details with renderings," and will inform decision-making by the mayor and City Council, Roswell said. Information, and to take the survey: https://bit.ly/2XrQL0Q

About the Author

David Ibata

More Stories