The Georgia Department of Transportation announced more nightly lane and ramp closures stemming from the reconstruction of the I-285/Ga. 400 interchange in the top-end Perimeter area of North Fulton and DeKalb counties.
The two left lanes of eastbound and westbound I-285 will be closed for roadway and bridge work between Glenridge Drive and Peachtree Dunwoody Road from 9 p.m. to 5 a.m., Monday through Saturday,
Separately, the entrance ramp from southbound Ga. 400 to westbound I-285 will be closed for bridge construction from 9 p.m. to 5 a.m., Tuesday through Saturday. The recommended detour is to continue south on Ga. 400, exist to the Glenridge Connector, turn right to the entrance ramp to northbound Ga. 400, and follow Ga. 400 back to I-285.
Finally, the ramp from Abernathy Road to southbound Ga. 400 is to be closed from 9 p.m. to 5 a.m., Thursday and Friday; and from southbound Ga. 400 to Abernathy, the same hours Friday and Saturday.
All work is "weather permitting" and subject to change, GDOT said. Information: https://bit.ly/2jfU8S7
About the Author