The artificial turf perimeter of Grant Field has been removed to make way for the installation of natural grass.
Photo: Ken Sugiura/ksugiura@ajc.com
Photo: Ken Sugiura/ksugiura@ajc.com

Bobby Dodd Stadium being prepared for Atlanta United games

Georgia Tech has begun preparing Grant Field for Atlanta United’s arrival in March.

A project is underway at the 103-year-old field so that the playing surface will meet MLS specifications for the new franchise’s games. Tech will host games until Mercedes-Benz Stadium opens in the summer, with the season opener scheduled for March 5.

A football field is 53 1/3 yards from sideline to sideline. MLS dictates that fields must be at least 70 yards wide and 110 yards long. The maximum width is 80 yards and the maximum length 120 yards.

Read the complete story here.

Support real journalism. Support local journalism. Subscribe to The Atlanta Journal-Constitution today. See offers.

Your subscription to the Atlanta Journal-Constitution funds in-depth reporting and investigations that keep you informed. Thank you for supporting real journalism.

X