Georgia DOT will continue the widening of State Route 20 this week by adding fiber optic cable for communication between the corridor’s traffic signals. Construction will result in single lane closures between 9 a.m. and 4 p.m. through June 28 on S.R. 20 between Sugar Hill Road and James Burgess Road in Sugar Hill.

Traffic will be reduced to one lane in each direction intermittently and is expected to create minor delays. Drivers are asked to slow down near the work zone since Georgia DOT contractors will be in close proximity to travel lanes.

About the Author

Featured

Rose Scott signals as Closer Look goes on air in the WABE studio. An Atlanta resident left WABE a $3 million donation, a boost after WABE lost $1.9 million in annual funding from the Corporation of Public Broadcasting. (Ben Gray / AJC file)

Credit: Ben Gray