The Georgia Department of Transportation announced possible delays, reduced speeds and detours with nightly road closures for the ongoing reconstruction of the Ga. 400/I-285 interchange in the Perimeter area of Sandy Springs, Dunwoody and Brookhaven.

All closures are “weather permitting” and scheduled for 9 p.m. to 5 a.m.:

Monday-Thursday: the ramp from westbound I-285 to northbound Ga. 400, and one right lane of northbound Ga. 400 from I-285 to Hammond Drive; Monday-Saturday: two right lanes of westbound I-285 from Chamblee Dunwoody to Ashford Dunwoody roads.

Tuesday-Thursday: Peachtree Dunwoody Road from Hammond to Lake Hearn drives, and the ramp from Peachtree Dunwoody to eastbound I-285; Tuesday-Saturday: the ramp from westbound I-285 to Roswell Road, and one right lane of southbound Ga. 400 from Windsor Parkway to Loridans Drive.

Wednesday (overnight): one right lane of Ga. 400 southbound from Pitts Road to Spalding Drive.

Thursday-Saturday: the ramp from southbound Ga. 400 to westbound I-285.

Information: https://bit.ly/2VbAGeH

About the Author

Keep Reading

Carden Wyckoff speaks to media members during a press conference outside Five Points station on Thursday, June 25, 2025. (Miguel Martinez/AJC)

Credit: Miguel Martinez/AJC

Featured

Fulton DA Fani Willis (center) with Nathan J. Wade (right), the special prosecutor she hired to manage the Trump case and had a romantic relationship with, at a news conference announcing charges against President-elect Donald Trump and others in Atlanta, Aug. 14, 2023. Georgia’s Supreme Court on Tuesday, Sept. 16, 2025, upheld an appeals court's decision to disqualify Willis from the election interference case against Trump and his allies. (Kenny Holston/New York Times)

Credit: NYT