Peachtree City’s Public Works Department has begun preparing several stretches of multi-use paths for repaving. Pre-grading has begun in the areas near Rubicon Road, the Ga. Hwy. 74 bridge, Cameron Trail, Wheatleigh Curve, Tuxedo Lane/Smokerise Point and Landen Point.

Although paving won’t begin for another month or so when the weather is warmer, early preparation allows the department to coordinate projects, save money and ultimately repave the maximum amount of path space. The pre-graded paths are safe for use unless otherwise marked.

About the Author

Featured

Rose Scott signals as Closer Look goes on air in the WABE studio. An Atlanta resident left WABE a $3 million donation, a boost after WABE lost $1.9 million in annual funding from the Corporation of Public Broadcasting. (Ben Gray / AJC file)

Credit: Ben Gray