A stalled vehicle and construction work have joined forces to turn the Downtown Connector into a parking lot. The stall is expected to be cleared shortly after 3 p.m., but traffic is backed up from Midtown to Turner Field.

Motorists are advised to avoid the area if possible.

Featured

A MARTA operator is seen inside the control room of one of the new MARTA trains during the unveiling of these trains on Thursday, Jan. 30, 2025. (Miguel Martinez/AJC)

Credit: Miguel Martinez-Jimenez