Lawrenceville officials recently agreed to rescind a contract for the 1291 Creek Wood Cove Storm Drain Replacement Project with Kennedy & Tillman, LLC.

The $206,910 contract would have included demolition and removal of the existing CMP storm drain system and installation of a new drain system using RCP and HDPE pipe that will tie-in to existing structures. When eventually completed, the project will also include the installation of a curb and gutter.

This project was awarded by the Lawrenceville City Council at the Sept. 4, 2019 meeting. The two principals of the company have since retired and closed their business. The city’s engineering department is revising the specifications and will be re-bidding the project.

About the Author

Keep Reading

Police respond to North Atlanta High School after a student was injured in an altercation with another student Friday. (Ben Hendren for the AJC)

Credit: Ben Hendren

Featured

Waymo autonomous vehicles operate across 65 square miles inside I-285 and have been involved in six incidents with Atlanta Public School buses since May. Waymo issued a recall because of their cars briefly stopping or slowing down before continuing forward while a bus was stopped and flashing its lights. (Courtesy of Atlanta Public Schools)

Credit: Courtesy of Atlanta Public Schools