Skip to Main Content
Metro Atlanta

After 4 months, Cobb’s historic Concord Road covered bridge re-opens

The Concord Road covered bridge re-opened Dec. 15, 2017, after four months of renovations.
The Concord Road covered bridge re-opened Dec. 15, 2017, after four months of renovations.
Ben Brasch
By Ben Brasch

The historic Concord Road covered bridge re-opened Friday after four months of renovations.

County commissioners OK'd the $802,959 revamp of the bridge in May funded by the 2016 SPLOST, or Special Purpose Local Option Sales Tax.

It was supposed to open earlier but was delayed by the snow that blanketed metro Atlanta.

Crews replaced the bridge’s decaying siding and shingles, added structural supports and repainted the structure.

The bridge, which spans Nickajack Creek, had been starting to lean. The contractor told the county that it took 20 minutes to straighten the 145-year-old bridge.

Workers in 2009 installed beams that look like a giant staple at the entrance of the bridge to warn drivers of the seven-foot height limit, but the county reports that the bridge still gets hit about once a month.