Braselton officials released details recently for a new water spray park to be built at the Braselton Park, 126 Harrison St. The city’s request for proposal indicates a budget of $100,000 has been set to include the design, delivery and installation of the spray park.
Design requirements for the spray park include a zero contained depth with gravity flow non-suction drains, recirculating filtration system, automated control, and low-flow water conservation. In addition, all access and decking must comply with the Americans with Disabilities Act standards.
Proposals for the work will be accepted until 4 p.m. Jan. 30 at the Braselton Town Hall, 4982 Highway 53.
Information: www.braselton.net.
About the Author
The Latest