If you live in the city of Johns Creek, or if you drive that way as a commuting cut-through (as many people do), you already know.

The city in North Fulton county is a hive of road construction.

Jones Bridge and Old Alabama roads are being widened. Bridges at Bell and Parsons roads are being torn out and replaced. And roundabouts are being installed in two places: at the intersection of Bell and Boles roads and the intersection of Crossington and Sargent roads.

Today's Atlanta Journal-Constitution story dives into how much it's costing, and when it will end.

About the Author

Featured

Managing Partner at Atlantica Properties, Darion Dunn (center) talks with Atlanta Mayor Andre Dickens during a tour following the ribbon cutting of Waterworks Village as part of the third phase of the city’s Rapid Housing Initiative on Wednesday, Dec. 3, 2025.
(Miguel Martinez/AJC)

Credit: Miguel Martinez-Jimenez