Six Flags Drive will be closed to through traffic Feb. 16 through May 1 between Riverside Parkway and Six Flags Parkway.
This upcoming project consists of minor widening, the addition of curb and gutter and construction of a five-foot-wide sidewalk along the north side of Six Flags Drive from Riverside Parkway to Six Flags Parkway.
The project also includes signal improvements and the replacement of a triple 72-inch corrugated metal pipe culvert with a double seven-foot by six-foot concrete box culvert.
Information: cobbdot.org.
About the Author
The Latest