Here is the latest information on lane closings, and possible traffic delays, this weekend in metro Atlanta, per GDOT.
Click here to get more information about Atlanta's weather and weekend events
I-285
• One lane and part of the entrance and exit ramps northbound from SR 260/Glenwood Road to Chamblee Tucker Road will close nightly from 9 p.m. Friday to 5 a.m. Monday for striping.
• On the southwest side, one lane will close on the westbound collector-distributer lane at the I-85 interchange from 9 p.m. Friday to 5 a.m. Monday.
• Two northbound lanes will close from SR 6/Camp Creek Parkway to South Atlanta Road and two southbound lanes will close from SR 6/Camp Creek Parkway to the I-20 interchange from 9 p.m. Friday to 5 a.m. Monday.
• One lane will close on the eastbound ramp to I-85 northbound from 9 p.m. Friday to 5 a.m. Monday.
• The Express Lanes project will require westbound traffic to shift onto the collector-distributer lanes at the I-75 interchange from 9 p.m. Friday to 10 a.m. Saturday for a pacing operation.
I-20
• Two westbound lanes will close from Langhorn Street to SR 139/Martin Luther King Jr. Drive from 9 p.m. Friday to 5 a.m. Monday.
• Two westbound lanes from Alcovy Road to SR 12/US 278 and the ramp from Alcovy Road to I-20 will close continuously from 9 p.m. Friday to 5 a.m. Monday.
I-85
• One northbound and one southbound lane will close from SR 139/Riverdale Road to Cleveland Avenue nightly from 9 p.m. Friday to 5 a.m. Monday for striping.
• One lane will close on the northbound ramp to I-285 eastbound from 9 p.m. Friday to 5 a.m. Monday.
I-75
• One lane will close northbound at SR 5 SPUR from 9 a.m. to 1 p.m. Saturday for guardrail repairs.
• Sign structure work will require two lane closures northbound from SR 280/Delk Road to Windy Hill Road from 9 p.m. Friday to 7 a.m.Saturday.
• The Express Lanes project will require various lane closures northbound and southbound at the Hickory Grove Road from 9 p.m. Friday to 10 a.m. Saturday to place beams.
• The Express Lanes project will also require one southbound lane to close at SR 120/North Marietta Parkway from 9 p.m. Friday to 10 a.m. Saturday.
State roads, highways and surface streets
• On SR 316, one westbound lane from Herrington Road to SR 120 and ramps at Sugarloaf Parkway, SR 120 and Riverside Parkway will close continuously from 9 p.m. Friday to 5 a.m. Monday for resurfacing.
• On U.S. 78, two westbound lanes will close from the I-285 interchange to Memorial Drive from 9 p.m. Friday to 9 a.m. Saturday.
• One lane will close southbound from SR 138 to SR 155 from 9 p.m. Friday to 7 a.m. Monday for work on the South Metro Express Lanes.
• On SR 154/Memorial Drive, one lane will close between Moreland Avenue and Wilkinson Drive and one lane will close on SR 154/Memorial Drive between East Lake Drive and Candler Road. Both closures are from 9 a.m. to 3 p.m. Saturday.
Click here to get realtime updates on traffic conditions around the metro area
Follow the @AJCWSBTraffic on Twitter to get those updates on the go