Georgia Tech has begun preparing Grant Field for Atlanta United’s arrival in March.

A project is underway at the 103-year-old field so that the playing surface will meet MLS specifications for the new franchise’s games. Tech will host games until Mercedes-Benz Stadium opens in the summer, with the season opener scheduled for March 5.

A football field is 53 1/3 yards from sideline to sideline. MLS dictates that fields must be at least 70 yards wide and 110 yards long. The maximum width is 80 yards and the maximum length 120 yards.

Keep Reading

Georgia Tech fans cheer after wide receiver Malik Rutherford (8) scored a touchdown during the first half of an NCAA college football game at Georgia Tech's Bobby Dodd Stadium, Saturday, November 9, 2024, in Atlanta. (Hyosub Shin / AJC)

Credit: HYOSUB SHIN / AJC

Featured

Aerial photo shows demonstrators holding signs to oppose Trump’s immigration policies during “No Cake for False Kings” protest on the 17th Street NW Bridge, Saturday, June 14, 2025, in Atlanta. (Hyosub Shin / AJC)

Credit: HYOSUB SHIN / AJC