Impact: Low
| | First Reported: 5:35 AM on September 13th | Delays possible on: METRO ATLANTA AREA South METRO ATLANTA AREA -DELAYS POSSIBLE - DOT IS ADVISING MOTORIST THAT CONVOYS OF MILITARY VEHICLES WILL BE ROLLING THRU THE ATLANTA METRO AREA TODAY AS THEY HEAD TOWARD THE GULF COAST AS PART OF RELIEF EFFORTS FOR VICTIMS OF HURRICANE KATRINA. DELAYS POSSIBLE ON 75, 85 SOUTH AND I-20 WEST BOUND () #R
|
|
Impact:
| | First Reported: 7:13 AM | Smog alert on: ATLANTA / NORTH GA AREA ATLANTA / NORTH GA AREA -SMOG ALERT - ``CODE ORANGE` ALERT TODAY. CHILDREN, PEOPLE WHO ARE SENSITIVE TO OZONE, AND PEOPLE WITH HEART OR LUNG DISEASE SHOULD LIMIT PROLONGED OUTDOOR EXERTION DURING THE AFTERNOON OR EARLY EVENING WHEN OZONE LEVELS ARE HIGHEST. CARPOOL, COMBINE TRIPS. () #R
|
|
Impact:
| | First Reported: 4:28 PM | Expected trip time on: I-20 (WEST EXPWY) West and I-75/I-85 CONN EXPECTED TRIP TIME : I-20 (WEST EXPWY) WESTBOUND FROM I-75/I-85 CONN TO WESTSIDE PERIMETER (I-285). 6 MINUTES () #R
|
|
Impact:
| | First Reported: 4:59 PM | Expected trip time on: DOWNTOWN CONNECTOR (I-75 / I-85) North and langford pkwy (hwy 166) EXPECTED TRIP TIME : DOWNTOWN CONNECTOR (I-75 / I-85) NORTHBOUND FROM LANGFORD PKWY (HWY 166) TO I-75/85 SPLIT AT BROOKWOOD. 8 - 10 MINUTES () #R
|
|
Impact:
| | First Reported: 4:32 PM | Expected trip time on: EASTSIDE PERIMETER (I-285) North and I-20 (EAST EXPWY) EXPECTED TRIP TIME : EASTSIDE PERIMETER (I-285) NORTHBOUND FROM I-20 (EAST EXPWY) TO I-85. 14 MINUTES () #R
|
|
Impact:
| | First Reported: 5:00 PM | Expected trip time on: I-75 South and SOUTHSIDE PERIMETER (I-285) EXPECTED TRIP TIME : I-75 SOUTHBOUND FROM SOUTHSIDE PERIMETER (I-285) TO HUDSON BRIDGE RD. 12 MINUTES () #R
|
|
Impact:
| | First Reported: 5:00 PM | Expected trip time on: I-675 South and I-285 EXPECTED TRIP TIME : I-675 SOUTHBOUND FROM I-285 TO I-75. 10 MINUTES () #R
|
|
Impact:
| | First Reported: 5:01 PM | Expected trip time on: DOWNTOWN CONNECTOR (I-75 / I-85) South and i-75/85 split at brookwood EXPECTED TRIP TIME : DOWNTOWN CONNECTOR (I-75 / I-85) SOUTHBOUND FROM I-75/85 SPLIT AT BROOKWOOD TO LANGFORD PKWY (HWY 166). 9 - 13 MINUTES / SLOW BETWEEN BROOKWOOD AND I-20 () #R
|
|
Impact:
| | First Reported: 4:28 PM | Expected trip time on: I-20 (EAST EXPWY) East and I-75/I-85 CONN EXPECTED TRIP TIME : I-20 (EAST EXPWY) EASTBOUND FROM I-75/I-85 CONN TO WESLEY CHAPEL RD. 11 MINUTES () #R
|
|
Impact: Medium
| | First Reported: 6:28 AM on September 10th | Planned construction on: DOWNTOWN CONNECTOR (I-75 / I-85) (Both Directions) and 10TH ST NW (OVERPASS) PLANNED CONSTRUCTION : DOWNTOWN CONNECTOR (I-75 / I-85) IN BOTH DIRECTIONS BETWEEN 10TH ST NW (OVERPASS) AND NORTH AV WORK ON THE 5TH STREET PEDESTRIAN BRIDGE.....WEATHER PERMITTING.... LANE CLOSURES EXPECTED ON I-75/I-85 BETWEEN 9PM AND 5AM NIGHTLY. EXPECT DELAYS. PROJECT COMPLETION: FALL, 2006. () #R
|
|
Impact: Medium
| | First Reported: 6:28 AM on September 10th | Bridge maintenance operations on: I-20 (EAST EXPWY) (Both Directions) and WESLEY CHAPEL RD BRIDGE MAINTENANCE OPERATIONS - - I-20 (EAST EXPWY) IN BOTH DIRECTIONS AT WESLEY CHAPEL RD. DEMOLITION AND RECONSTRUCTION OF WESLEY CHAPEL RD BRIDGE OVER I-20. ....WEATHER PERMITTING.... LANE CLOSURES COULD BE EXPECTED ON I-20, AND DETOURS FOR WESLEY CHAPEL RD. EXPECT DELAYS. PROJECT COMPLETION: SPRING 2007. () #R
|
|
Impact: Medium
| | First Reported: 6:28 AM on September 10th | Planned construction on: I-20 (EAST EXPWY) (Both Directions) and US 278 (LITHONIA) PLANNED CONSTRUCTION : I-20 (EAST EXPWY) IN BOTH DIRECTIONS BETWEEN US 278 (LITHONIA) AND TURNER HILL RD (LITHONIA) ROAD IMPROVEMENTS TO INCLUDE WIDENING & RESURFACING OF INTERSTATE, AND RECONSTRUCTION OF THE LITHONIA INDUSTRIAL BLVD OVERPASS.....WEATHER PERMITTING.... LANE CLOSURES CAN BE EXPECTED IN THE AREA. PROJECT COMPLETION- JUNE, 2006. () #R
|
|
Impact: High
| | First Reported: 5:26 PM | Accident on: CANDLER RD and FLAT SHOALS RD ACCIDENT - PANTHERSVILLE - CANDLER RD AT FLAT SHOALS RD. ()
|
|
Impact: High
| | First Reported: 5:27 PM | Vehicle on fire on: MORELAND AV (US 23) South and CUSTER AV SE VEHICLE ON FIRE - ATLANTA - MORELAND AV (US 23) SB AT CUSTER AV SE. () #R
|
|