AJC.COM TRAFFIC REPORT
Text List of Traffic Incidents: Northeast Suburbs

Data updated every 10 minutes. Incidents are listed in order of severity. The time and date on construction reports reflect the most recent change in status.

More Lists: All areas | Central | Northeast | Northwest | Southeast | Southwest

Impact: Low
 First Reported: 5:35 AM on September 13th
Delays possible on: METRO ATLANTA AREA South
METRO ATLANTA AREA -DELAYS POSSIBLE - DOT IS ADVISING MOTORIST THAT CONVOYS OF MILITARY VEHICLES WILL BE ROLLING THRU THE ATLANTA METRO AREA TODAY AS THEY HEAD TOWARD THE GULF COAST AS PART OF RELIEF EFFORTS FOR VICTIMS OF HURRICANE KATRINA. DELAYS POSSIBLE ON 75, 85 SOUTH AND I-20 WEST BOUND () #R


Impact:
 First Reported: 7:13 AM
Smog alert on: ATLANTA / NORTH GA AREA
ATLANTA / NORTH GA AREA -SMOG ALERT - ``CODE ORANGE` ALERT TODAY. CHILDREN, PEOPLE WHO ARE SENSITIVE TO OZONE, AND PEOPLE WITH HEART OR LUNG DISEASE SHOULD LIMIT PROLONGED OUTDOOR EXERTION DURING THE AFTERNOON OR EARLY EVENING WHEN OZONE LEVELS ARE HIGHEST. CARPOOL, COMBINE TRIPS. () #R


Impact:
 First Reported: 4:28 PM
Expected trip time on: STONE MOUNTAIN FWY (US 78) East and EASTSIDE PERIMETER (I-285)
EXPECTED TRIP TIME : STONE MOUNTAIN FWY (US 78) EASTBOUND FROM EASTSIDE PERIMETER (I-285) TO ROCKBRIDGE RD SW. 10 - 12 MINUTES () #R


Impact:
 First Reported: 5:02 PM
Expected trip time on: I-85 North and I-285 (NORTHSIDE)
EXPECTED TRIP TIME : I-85 NORTHBOUND FROM I-285 (NORTHSIDE) TO HWY 316. 14 - 16 MINUTES / CONGESTED BETWEEN I-285 AND BEAVER RUIN RD () #R


Impact:
 First Reported: 4:31 PM
Expected trip time on: TOP END PERIMETER (I-285) West and I-85
EXPECTED TRIP TIME : TOP END PERIMETER (I-285) WESTBOUND FROM I-85 TO I-75 . 14 MINUTES / A LITTLE THICK BETWEEN NORTHSIDE DR AND I-75 () #R


Impact:
 First Reported: 4:32 PM
Expected trip time on: EASTSIDE PERIMETER (I-285) South and I-85 (NORTH EAST EXPWY)
EXPECTED TRIP TIME : EASTSIDE PERIMETER (I-285) SOUTHBOUND FROM I-85 (NORTH EAST EXPWY) TO I-20 (EAST EXPWY). 16 MINUTES / CONGESTION BETWEEN US 78 AND MEMORIAL DR () #R


Impact:
 First Reported: 5:01 PM
Expected trip time on: DOWNTOWN CONNECTOR (I-75 / I-85) South and i-75/85 split at brookwood
EXPECTED TRIP TIME : DOWNTOWN CONNECTOR (I-75 / I-85) SOUTHBOUND FROM I-75/85 SPLIT AT BROOKWOOD TO LANGFORD PKWY (HWY 166). 9 - 13 MINUTES / SLOW BETWEEN BROOKWOOD AND I-20 () #R


Impact:
 First Reported: 5:03 PM
Expected trip time on: GEORGIA 400 (US 19) North and I-285
EXPECTED TRIP TIME : GEORGIA 400 (US 19) NORTHBOUND FROM I-285 TO OLD MILTON PKWY. 16 MINUTES () #R


Impact:
 First Reported: 4:28 PM
Expected trip time on: I-20 (EAST EXPWY) East and I-75/I-85 CONN
EXPECTED TRIP TIME : I-20 (EAST EXPWY) EASTBOUND FROM I-75/I-85 CONN TO WESLEY CHAPEL RD. 11 MINUTES () #R


Impact:
 First Reported: 4:28 PM
Expected trip time on: I-20 (WEST EXPWY) West and I-75/I-85 CONN
EXPECTED TRIP TIME : I-20 (WEST EXPWY) WESTBOUND FROM I-75/I-85 CONN TO WESTSIDE PERIMETER (I-285). 6 MINUTES () #R


Impact: Medium
 First Reported: 6:28 AM on September 10th
Planned construction on: DOWNTOWN CONNECTOR (I-75 / I-85) (Both Directions) and 10TH ST NW (OVERPASS)
PLANNED CONSTRUCTION : DOWNTOWN CONNECTOR (I-75 / I-85) IN BOTH DIRECTIONS BETWEEN 10TH ST NW (OVERPASS) AND NORTH AV WORK ON THE 5TH STREET PEDESTRIAN BRIDGE.....WEATHER PERMITTING.... LANE CLOSURES EXPECTED ON I-75/I-85 BETWEEN 9PM AND 5AM NIGHTLY. EXPECT DELAYS. PROJECT COMPLETION: FALL, 2006. () #R


Impact: Low
 First Reported: 6:27 AM on September 10th
Planned construction on: STONE MOUNTAIN FWY (US 78) (Both Directions) and EASTSIDE PERIMETER (I-285)
PLANNED CONSTRUCTION : STONE MOUNTAIN FWY (US 78) IN BOTH DIRECTIONS BETWEEN EASTSIDE PERIMETER (I-285) AND STONE MOUNTAIN BYP EXPECT DELAYS FOR GUARDRAIL UPGRADES. EXPECTED TO BEGIN SUMMER 2005 () #R


Impact: Low
 First Reported: 6:26 AM on September 10th
Planned construction on: GEORGIA 400 (US 19) (Both Directions) and I-85
PLANNED CONSTRUCTION : GEORGIA 400 (US 19) IN BOTH DIRECTIONS BETWEEN I-85 AND I-285 RESURFACING & GUARDRAIL PROJECT. EXPECT DELAYS AND LANE CLOSURES DURING OFF PEAK HOURS & WEEKENDS. EXPECTED COMPLETION- FALL 2005 (FULTON COUNTY) () #R


Impact: Low
 First Reported: 6:27 AM on September 10th
Road construction during off-peak periods on: PEACHTREE INDUSTRIAL BLVD (Both Directions) and WINTERS CHAPEL RD
ROAD CONSTRUCTION DURING OFF-PEAK PERIODS : PEACHTREE INDUSTRIAL BLVD IN BOTH DIRECTIONS BETWEEN WINTERS CHAPEL RD AND PEACHTREE RD (CHAMBLEE) RESURFACING PROJECT. EXPECT DELAYS. START- SUMMER 2005 (DEKALB COUNTY) () #R


Impact: Medium
 First Reported: 5:12 PM
Accident on the left shoulder on: I-85 North and INDIAN TRAIL LILBURN RD NORTHWEST
ACCIDENT ON THE LEFT SHOULDER: I-85 NORTHBOUND BEFORE INDIAN TRAIL LILBURN RD NORTHWEST, TRAFFIC SLOWS BACK TO SHALLOWFORD RD () #R


Impact: Low
 First Reported: 5:23 PM
Accident on the right shoulder on: TOP END PERIMETER (I-285) East and ASHFORD DUNWOODY RD
ACCIDENT ON THE RIGHT SHOULDER - DUNWOODY - TOP END PERIMETER (I-285) EB AT ASHFORD DUNWOODY RD. () #R


Impact: High
 First Reported: 5:23 PM
Accident reported on: LAWRENCEVILLE HWY and I-285
ACCIDENT REPORTED - TUCKER - LAWRENCEVILLE HWY AT I-285. () #R


Impact: Medium
 First Reported: 5:24 PM
Accident reported on: I-85 North and SHALLOWFORD RD
ACCIDENT REPORTED - NORTH ATLANTA - I-85 NB AT SHALLOWFORD RD. () #R


Impact: Medium
 First Reported: 5:25 PM
Accident on: CLAIRMONT RD North and BUFORD HWY NE
ACCIDENT - - CLAIRMONT RD NB AT BUFORD HWY NE. () #R


Impact: Medium
 First Reported: 5:27 PM
Accident on: PEACHTREE ST NW and PEACHTREE VALLEY RD
ACCIDENT - BUCKHEAD - PEACHTREE ST NW AT PEACHTREE VALLEY RD. () #R




Text Listings
All | Central Atlanta | Northeast | Northwest | Southeast | Southwest

Interactive Traffic Maps
All | Central Atlanta | Northeast | Northwest | Southeast | Southwest

More for Atlanta Drivers
Atlanta Driving Terms
Maps and Driving Directions

Kudzu Services » Find the right people for the job